Rosedale Heights
Location: Brgy Poblacion Malvar, Batangas
Developer: Borland Development Corporation
House Type: 2 Storey Townhouse
Status: Preselling / for construction
Turn-over: 18-20th month after reservation
PAGIBIG FINANCING
LOT AREA : 40 SQM
FLOOR AREA : 46 SQM
2-3 Bedroom Provision
1 Toilet and Bath
Living Area
Dining Area
Kitchen Area
Option 1: Pagibig Financing
Total Contract Price - P771,016.00
Reservation Fee - P5,000.00
Equity - P96,016.00
Payable in 20 months - P4,550.80/month
Pagibig Loanable Amount - P675,000.00
Pagibig Monthly Amortization
30 years - P 4,266.46
Option 2: INHouse Financing
Total Contract Price - P731,016.00
Reservation Fee - P5,000.00
Equity - P175,443.84
Payable in 20 months - P8,522.19/month
Pagibig Loanable Amount - P555,572.16
INHouse Monthly Amortization
10 years - P 8,295.29
INITIAL REQUIREMENT (YOU MAY BRING IT DURING TRIPPING COMPLETE WITH RESERVATION FEE):
Requirements for Reservation:
1. One (1) month updated Payslip
2. Company ID
3. Any government issued id
4. Reservation Fee - P5,000
HOUSE SPECIFICATIONS:
EXTERIOR DETAILS:
ROOFING: Long Span Colored Roof on Steel Roof Framing
WINDOWS: Steel Casement with built-in grills
WALL: Painted Plain Cement Finish
INTERIOR DETAILS:
DOOR:
-Main Door: Steel Door
-Service Door: Flush Door
-T&B Door: PVC Door
WALL FINISHES:
-Interior Wall: Plain Cement Finish
-T&B Wall: With 8"X8" Glazed ceramic tiles (6 layers)
FLOOR FINISHES:
-Ground Floor: Plastered Cement Finish
-Second Floor: Plastered Cement Finish
-T&B: 8"X8" Unglazed Ceramic Tiles
KITCHEN COUNTER: Plain Cement Finish w/ stainless sink
TOILET & BATH: Flush Type Water Closet, wall hang ceramic Lavatory woth Faucet and Handheld Shower Head
CEILING: Interior Ceiling: Fiber Cement Board on Metal Furring Frame
Exterior: Fiber Cement Board, Painted QDE
STAIRS: Steel Stairs with Handrail
AMENITIES & FACILITIES
-Entrance Gate
-Clubhouse
-Basketball Court
-Perimeter Fence
-Concrete Roads & Alleys
-Underground Drainage System
-Centralized Water System
-Meralco Electrical Supply
PAG IBIG BASIC REQUIREMENT (YOU MAY BRING IT DURING TRIPPING COMPLETE WITH RESERVATION FEE):
24 Months Updated Pag-ibig Contribution
Valid IDs
ID Pics 1x1
Proof of Billing/Remittance
Payslip
Birth/Marriage
Certificate Certificate of Employment/Job Contract
TIN/Passport
Cedula
SPA (IF NEEDED, especially for OFW)
MSVS (to follow upon seminar in PAG IBIG)
Post Dated Check
*****************************************
|